In short: Typical published terms from Chinese FRP makers: grating MOQ around 50 m² (some have none), handrail MOQ about 50–1,000 m, and production in about 15 working days, stretching to about a month in peak season. Panels ship on wooden or steel pallets with film and corner protection. One maker publishes about 129 panels (576 m²) of 25 mm, 1220×3660 grating per 20GP and about 288 panels of 38 mm per 40HQ. These are typical industry ranges, not FIBROVX terms.

What MOQs are typical?
Figures below are typical industry ranges collected from published Chinese manufacturer listings and data sheets. They are not FIBROVX guarantees or quotes.
| Product | Typical MOQ |
|---|---|
| Molded FRP grating | about 50 m²; some makers have no fixed MOQ |
| FRP handrail | about 50–1,000 m |
| Galvanized steel grating (comparison) | about 300–500 m² |
How long is lead time?
- Standard grating: about 15 working days; about 15–30 calendar days in one price sheet.
- Peak season: about one month.
- Handrail: about 10–15 days after deposit; one maker quotes 30–35 days for a 20 ft container.
- Plus shipping: add sea freight and customs time.
Deposits of 30% or 50% before production are common.

How is FRP packed?
- Grating: wooden or steel pallets, EPE foam and film, strapping and corner guards.
- Profiles and handrail: bundled or on pallets.
- Labels: size, quantity and order number on each pallet.
How many panels fit in a container?
| Depth | 20GP | 40HQ |
|---|---|---|
| 25 mm | 129 panels, 576 m² | 448 panels, 2,000 m² |
| 30 mm | 105 panels, 487 m² | not given |
| 38 mm | 84 panels, 375 m² | 288 panels, 1,286 m² |
A second maker publishes 245 panels of 38 mm per 40HQ, so counts vary with packing. Published gross weights reach about 25.9 t for full 40HQ loads, so thick panels hit the weight limit before the volume limit.

How do you plan an order?
- Fix quantities from a cut list.
- Ask for the loading plan: panels per container and gross weight.
- Agree Incoterms: CIF or FOB.
- Book inspection before loading: see inspection checklist.
More: importing FRP from China.
How FIBROVX can help
Send quantities and destination port and we will send a loading plan with the quote. Request a quote. CIF by default, FOB on request.

Common mistakes
- Ignoring peak season: lead times stretch.
- Assuming every 40HQ holds the same: depth and packing change it.
- Forgetting weight limits: thick panels max out on weight.
- No inspection: problems found at destination are costly.
Key terms
- MOQ: minimum order quantity.
- 20GP / 40HQ: 20 ft general purpose / 40 ft high cube container.
- EPE: expanded polyethylene foam.
- Loading plan: how goods are stacked in the container.
Watch: FRP Export MOQ, Lead Time and Loading in 27 Seconds
FAQ
What is the MOQ for FRP grating? Listings commonly show about 50 m²; some makers have no fixed MOQ.
How long does FRP grating production take? About 15 working days typically, up to about a month in peak season.
How much FRP grating fits in a 20 ft container? One maker publishes 129 panels (576 m²) of 25 mm and 84 panels (375 m²) of 38 mm, 1220×3660 mm.
How is FRP grating packed? On wooden or steel pallets with foam, film, straps and corner guards.
Related guides
- Importing FRP from China
- FRP grating RFQ checklist
- FRP grating panel sizes
- Third-party inspection checklist
- Request a quote
Sources
- A Chinese manufacturer, 38×38 mm molded FRP grating listing (B2B marketplace listing)
- A Chinese manufacturer, molded FRP grating panel listing (B2B marketplace listing)
- An FRP grating supplier, Molded FRP grating pricing (EXW, Oct 2026)
- A Chinese manufacturer, FRP handrail listing
- ExportHub, FRP guardrail listing: https://www.exporthub.com/product/frp-guardrail-11492153.html
- A Chinese manufacturer, container loading quantity of plastic grating
- A Chinese manufacturer, molded FRP grating packing and container example