In short: Secondary containment catches a leak from a tank. The usual options are a bund (dike), a double-wall tank or a containment tray. Capacity rules depend on location and chemical. England's oil storage rules require 110% of a single tank, or for several tanks the greater of 110% of the largest or 25% of the total. US hazardous waste rules require 100% of the largest tank plus rainfall. Always check the rules that apply to your site.

What capacity rules apply?
| Rule | Applies to | Capacity requirement |
|---|---|---|
| England, Control of Pollution (Oil Storage) Regulations 2001 | Oil storage above set volumes | 110% of a single container; for several containers, at least 110% of the largest or 25% of the total, whichever is greater |
| US 40 CFR 264.193 | Hazardous waste tank systems | 100% of the largest tank plus precipitation from a 25-year, 24-hour storm (for outdoor systems) |
| US 40 CFR 112 (SPCC) | Oil storage above set volumes | Capacity of the largest container plus enough freeboard for precipitation |
| Local and industry codes | Chemicals, fire codes, permits | Varies; confirm with the regulator or insurer |
These are examples only. Chemical storage is often covered by local permits or national rules with their own requirements.
Which containment option suits FRP tanks?
- Concrete bund with a chemical-resistant lining: common for tank farms. The lining (for example FRP or vinyl ester) protects the concrete.
- Double-wall FRP tank: an inner tank inside an outer tank, with an interstitial space that can be monitored for leaks. It saves space.
- Containment tray or pan: for small tanks and IBCs.
- Leak detection: sensors in a sump or in the space between walls.

What design details matter?
- Compatibility: the bund lining must resist the stored chemical.
- Rainwater: a sump and a manual (normally closed) valve or pump. Never leave an open drain.
- Separation: keep incompatible chemicals, such as acids and hypochlorite, in separate bunds.
- Access: steps or stiles over bund walls. FRP grating and stair treads resist spills. See FRP grating guide.
How should containment be inspected?
- Regular visual checks: cracks, lining damage and standing liquid.
- Remove rainwater: after checking that it is not contaminated.
- Test leak detection: on a set schedule.
- Record: inspections and any releases.
See FRP tank inspection and maintenance.

How FIBROVX can help
Send us the tank sizes, chemicals and site layout, and we will propose single- or double-wall tanks and linings. Your engineer confirms which local rules apply. Request a quote. CIF by default, FOB on request.
Common mistakes
- Sizing for one tank when several share a bund: apply the multiple-container rule.
- Open bund drains: a leak goes straight to the drain.
- Mixing incompatible chemicals in one bund: they can react.
- Unlined concrete for acids: acids attack concrete.

Key terms
- Bund (dike): a walled area that contains spills.
- Double-wall tank: a tank with an inner and an outer shell.
- Interstitial space: the gap between the walls of a double-wall tank.
- Freeboard: extra height that allows for rainwater and waves.
FAQ
How big should a bund be? It depends on the rules. A common rule is 110% of the largest tank, and some rules add a percentage of the total or allow for rainfall.
Is a double-wall tank enough on its own? Often it can replace a bund, but check local rules and add leak monitoring.
Can FRP be used to line a bund? Yes. FRP and vinyl ester linings are commonly used to protect concrete bunds from chemicals.
What about rainwater in the bund? Remove it through a closed valve or pump after checking it is clean.
Related guides
- FRP storage tanks guide
- FRP tank installation
- FRP tank inspection and maintenance
- FRP tanks for hydrochloric acid
- Request a quote
Sources
- UK Government, Oil storage regulations for businesses: https://www.gov.uk/guidance/storing-oil-at-a-home-or-business
- US eCFR, 40 CFR 264.193 Containment and detection of releases: https://www.ecfr.gov/current/title-40/chapter-I/subchapter-I/part-264/subpart-J/section-264.193
- US eCFR, 40 CFR 112.8 SPCC requirements: https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-112